top of page
Baghdad company for gas turbines
SGC Turnkey for the rehabilitation & Controls upgrade for Gas Compression Station
Project Details

 

 

Project Name:

South Gas Company Rehabilitation for Gas Compression Station

Scope:

Turnkey for the rehabilitation and control upgrade of Gas turbines compression station in South Gas Company headquarter in Basra, IRAQ

Equipment:

Hitachi Packages with NUOVO Pignone Gas Turbines 1 x Fri , 1 x Fr3, 2 x Fr5

Completion: 23 months from September 2011

Manpower

Procurernent and administration (6)

Project and site Management (4)

Engineers (12)

Technicians (65)

Mullah Abdulla Power Plant 11 * Fr. 5 rehabilitation & control upgrade with Bantly Nevada system

 

Project Details

Project Name:

Rehabilitation of Mullah Abdulla Power PlantScope:Mullah Abdulla Power Plant 11* Fr.5 rehabilitation & control upgrade with Bantly Nevada system.Equipment:GE Fr5 Units

Manpower

Engineering and Design team (10)

Procurement and administration (6)

Project and site Management (4)

Engineers (20)

Technicians (100)

Subcontractors (4)

Subcontractors Manpower (30)

Mullah Abdulla Power Plant

Projects 

Baghdad company for gas turbines
Qarmat Ali Overhaul & Rehabilitation

Two (2) GE TM2500

Project Details

Project Name:

Qarmat Ali Overhaul & Rehabilitation for 2 TM2500 units

Customer: British Petroleum

Scope:

Manpower & technical services supply for the rehabilitation of 2 TM2600, including engines, packages, auxiliaries , and BOP at Qarmat Ali Rumailah oil field Basra

Equipment:

Two GE TM2500 gas burning units + EBOP + MBOP

Completion: 6 months from June 2011

Manpower

Project and site Management (3)

Engineers (4)

Technicians (15)

Al Haydria 500 MW Turnkey EPC Power Station Four New GE Fr9E Units  

Project Details

Project Name:

500 IOWA Haydria Gas Turbine Power Project

Customer: Iraqi Ministry of Electricity

Scope:

Turn key for the Engineering. Design, Procurement, and Construction (EPC) of 500 MW Greenfield Project.

Equipment:

Four (4) x Fr9E Tri-Fuel HFO burning units+EBOP + MBOP

Completion: 18 months from October 2011

Manpower

Engineering and Design team (12)

Procurement and administration (6)

Project and site Management (4)

Engineers (60)

Technicians (300)

Subcontractors (6)

Subcontractors Manpower (250)

Baghdad company Gas turbines Al Haydria  Power Station
Baghdad company for gas turbines
SOC Turnkey for New DCS System In PS2 (Samawah)

Project Details

Project Name:

New DCS Systems in PS2

Customer: South Oil Company (SOC) — Basrah, Ministry of Oil

Scope:

Turn key EPC for the design engineering, supply and construction of new DCS System, field instrumentation MOV's for PS2 (Samawah) Station of Strategic Pipeline

Equipment:

GE's Distributed Control System (DCS), an Integrated Control System, uniting Opti-Comp Mark Vle ITCC Solution and Plant controls in a tightly integrated architecture

Completion: March 2012

Manpower

Engineering and Design team (2)

Procurement and administration (2)

Project and site Management (2)

Engineers (3)

Technicians (6)

Subcontractors (2)

Subcontractors Manpower (4)

Baghdad company for gas turbines
SOC Turnkey Rehabilitation Turbine Compressors In PS 2 of Strategic Pipeline

Project Details

Project Name:

Rehabilitation of Gas Compression Station at Pump Station 2 Strategic Pipeline

Customer: South Oil Company (SOC) — Basrah, Ministry of Oil

Scope:

Turn key for the Rehabilitation of (4) GE NP Frame 1 and (2) Frame 3 Turbo Compressors and Controls Upgrade in Pump Station 2 Strategic Pipeline (Samawah)

Equipment:

Four MS 1002B Frame 1

Four Centrifugal Compressors PCL5034/20

Completion: Sept 2012

Manpower

Engineering and Design team (2)

Procurement and administration (4)

Project and site Management (2)

Engineers (6)

Technicians (12)

Subcontractors (3)

Subcontractors Manpower (12)

Baghdad company for gas turbines Baghdad company for gas turbines Baghdad company for gas turbines Baghdad company for gas turbines
South Fertilizer 52 MW Turnkey EPC Power Station

 

Project Details

Project Name:

South Fertilizer Power Station

Customer: South Fertilizer Company — Ministry of Industry, IRAQ

Scope:

Turnkey for the Engineering. Design, Procurement, and Construction (EPC) of Greenfield 50 MW Power Station
Project with Two new Nuovo Pi grione gas turbine M5001 PA and BOP at Khor Al Zubair Fertilizer plant

Equipment:

Two GE Nuovo Pignone gas turbine MS5001 PA (model MS5371)

Completion: July 2011

Manpower 

Engineering and Design team (4)

Procurement and administration (12)

Project and site Management (4)

Engineers (15)

Technicians (80)

Subcontractors (6)

Subcontractors Manpower (120)

Baghdad company for gas turbines
Taji 3 New Hitachi H25 Gas Turbines

 

Project Details

Project Name:

Taji Replacing 3 x Fr5 with 3 x H25 Gas Turbines Project

Customer:

Hitachi — UNDP/Japanese Funds

Scope:

Turnkey for the disassembly and removal of three GE Fr5 and replacing them with three Hitachi H25 Gas Turbines (Mechanical, Electrical, Controls, and Civil)

Equipment:

H25 Gas Turbine Generating units (25 MW)

Completion: Sept 2007

Manpower

Project and site Management (2)

Engineers(14)

Technicians (52)

Subcontractors (2)

Subcontractors Manpower (30)

Baghdad company for gas turbines
Baiji 3 x GE TM2500 Engine and Package Refurbishments 

 

Project Details

Project Name:

Baiji three GE TM2500 packages

Customer:

US Department of the Army, Joint contracting Command-IRAQ/Afghanistan, Project and Contracting Office (PCO)-Electrical Sector

Scope:

Turnkey of one LM2500 gas turbine engine and refurbishment of thee TM2500 packages

Equipment:

Three GE TM2500 Gas Turbine Generating units

Completion: July 2007

Manpower

Project and site Management (2)

Engineers (8)

Technicians (20)

Subcontractors (2)

Baghdad company for gas turbines
Mosul Overhaul 2 x Hitachi Fr5 Gas Turbines

 

Project Details

Project Name:

Mosul overhaul 2 x Hitachi Fr5 Gas Turbines Project

Customer:

Hitachi — UNDP/Japanese Funds

Scope:

Major overhaul of Turbine, Auxiliaries, and Balance of Plan

Equipment:

One Fr5 Gas Turbine Generating units (20 MW)

Completion: 2008

Manpower

Project and site Management (2)

Engineers (10)

Technicians (36)

Subcontractors (2)

Subcontractors Manpower (20)

Zafaraniya Diesel Power Station Overhaul
 

Project Details

Project Name:

Zafaraniya 4 x Wartsila Diesel Engine and Package refurbishment

Customer:

Fluor International/Coalition Provisional Authority (CPA)

Scope: Diesel overhaul, Generator rebuild, Piping and welding, Controls and control wiring construction, machining large parts

Equipment:

4 Wartsila Diesel Generating units (4 x 9 MW)

Completion: October 2004

Manpower

Site management (1)

Engineers (15)

Technicians (38)

Baghdad company for gas turbines
Baghdad company for gas turbines Baghdad company for gas turbines
Mosul 2 New Hitachi H25 Gas Turbines

 

Project Details

Project Name:

Mosul Replacing 2 x Fr5 with 2 x H25 Gas Turbines Project

Customer:

Hitachi — UNDP/Japanese Funds

Scope:

Turnkey for the disassembly and removal of two GE Fr5 and replacing them with two Hitachi H25 Gas Turbines (Mechanical, Electrical, Controls, and Civil)

Equipment:

One Fr5 Gas Turbine Generating units (20 MW)

Completion: 2008

Manpower

Project and site Management (2)

Engineers (10)

Technicians (36)

Subcontractors (2)   

Subcontractors Manpower (20)

Baghdad company for gas turbines
Karkh GEC RR AVON Engine and Package Repair

 

Project Details

Project Name:

GEC Rolls Royce AVON engine and package repair in the Karkh Water Treatment Plant (WTP)

Customer:

Readiness Management Support/ USAID

Scope:

Replacement of one RR AVON 1533 engine, package repair, AC Generator winding, and the supply and replacement of one GEC Power Turbine

Equipment:

GEC Rolls Royce AVON 1534-70/L Gas Turbine Generating unit (2 x 12.5 MW)

Completion: April 2004

Manpower

Site Manager (1)

Engineers (4)

Technicians (10)

Baghdad company for gas turbines
Qudus 250 MW Turnkey EPC Expansion Project Two New Tri-Fuel GE Fr9E

 

Project Details

Project Name:            

250 MW Quads Expansion Project

Customer: US Department of the Army, Joint contracting Command-IRAQ/Afghanistan, Project and Contracting Office (PCO)-Electrical Sector

Scope:

Turn key for the Engineering. Design, Procurement, and Construction (EPC) of 250 MW Expansion Project.

Equipment:

250 MW Two GE Fr9 Crude Burning units

Completion: April 2009

Manpower

Engineering and Design team (12)

Procurement and administration (6)

 Project and site Management (4)

Engineers (60)

Technicians (300)

Subcontractors (6)

 Subcontractors Manpower (250)

Baghdad company for gas turbines
Shuiba One GE Fr5 Rehabilitation & Controls Upgrade

 

Project Details

Project Name: Shauiba One GE Fr5 Rehabilitation Project

Customer: US Department of the Army, Joint contracting Command-IRAQ/Afghanistan, Project and Contracting Office (PC0)-Electrical Sector

Scope:

Turnkey for the rehabilitation, upgrade, and upgrade of one GE Fr5 Gas Turbine unit. Including Turbine, Auxiliaries, and Balance of Plant, and upgrade of control system from GE Mark II to Mark VI.

Equipment:

One Fr5 Gas Turbine Generating units (25 MW)

Completion: August 2007

Manpower

Project and site Management (2)

Engineers (12)

Technicians (20)

Subcontractors (3)

Subcontractors Manpower (40)

  • Facebook Metallic
  • Twitter Metallic
  • YouTube Metallic
  • LinkedIn Metallic
  • Google Metallic
bottom of page