SGC Turnkey for the rehabilitation & Controls upgrade for Gas Compression Station
Project Details
Project Name:
South Gas Company Rehabilitation for Gas Compression Station
Scope:
Turnkey for the rehabilitation and control upgrade of Gas turbines compression station in South Gas Company headquarter in Basra, IRAQ
Equipment:
Hitachi Packages with NUOVO Pignone Gas Turbines 1 x Fri , 1 x Fr3, 2 x Fr5
Completion: 23 months from September 2011
Manpower
Procurernent and administration (6)
Project and site Management (4)
Engineers (12)
Technicians (65)
Mullah Abdulla Power Plant 11 * Fr. 5 rehabilitation & control upgrade with Bantly Nevada system
Project Details
Project Name:
Rehabilitation of Mullah Abdulla Power PlantScope:Mullah Abdulla Power Plant 11* Fr.5 rehabilitation & control upgrade with Bantly Nevada system.Equipment:GE Fr5 Units
Manpower
Engineering and Design team (10)
Procurement and administration (6)
Project and site Management (4)
Engineers (20)
Technicians (100)
Subcontractors (4)
Subcontractors Manpower (30)

Projects

Qarmat Ali Overhaul & Rehabilitation
Two (2) GE TM2500
Project Details
Project Name:
Qarmat Ali Overhaul & Rehabilitation for 2 TM2500 units
Customer: British Petroleum
Scope:
Manpower & technical services supply for the rehabilitation of 2 TM2600, including engines, packages, auxiliaries , and BOP at Qarmat Ali Rumailah oil field Basra
Equipment:
Two GE TM2500 gas burning units + EBOP + MBOP
Completion: 6 months from June 2011
Manpower
Project and site Management (3)
Engineers (4)
Technicians (15)
Al Haydria 500 MW Turnkey EPC Power Station Four New GE Fr9E Units
Project Details
Project Name:
500 IOWA Haydria Gas Turbine Power Project
Customer: Iraqi Ministry of Electricity
Scope:
Turn key for the Engineering. Design, Procurement, and Construction (EPC) of 500 MW Greenfield Project.
Equipment:
Four (4) x Fr9E Tri-Fuel HFO burning units+EBOP + MBOP
Completion: 18 months from October 2011
Manpower
Engineering and Design team (12)
Procurement and administration (6)
Project and site Management (4)
Engineers (60)
Technicians (300)
Subcontractors (6)
Subcontractors Manpower (250)


SOC Turnkey for New DCS System In PS2 (Samawah)
Project Details
Project Name:
New DCS Systems in PS2
Customer: South Oil Company (SOC) — Basrah, Ministry of Oil
Scope:
Turn key EPC for the design engineering, supply and construction of new DCS System, field instrumentation MOV's for PS2 (Samawah) Station of Strategic Pipeline
Equipment:
GE's Distributed Control System (DCS), an Integrated Control System, uniting Opti-Comp Mark Vle ITCC Solution and Plant controls in a tightly integrated architecture
Completion: March 2012
Manpower
Engineering and Design team (2)
Procurement and administration (2)
Project and site Management (2)
Engineers (3)
Technicians (6)
Subcontractors (2)
Subcontractors Manpower (4)

SOC Turnkey Rehabilitation Turbine Compressors In PS 2 of Strategic Pipeline
Project Details
Project Name:
Rehabilitation of Gas Compression Station at Pump Station 2 Strategic Pipeline
Customer: South Oil Company (SOC) — Basrah, Ministry of Oil
Scope:
Turn key for the Rehabilitation of (4) GE NP Frame 1 and (2) Frame 3 Turbo Compressors and Controls Upgrade in Pump Station 2 Strategic Pipeline (Samawah)
Equipment:
Four MS 1002B Frame 1
Four Centrifugal Compressors PCL5034/20
Completion: Sept 2012
Manpower
Engineering and Design team (2)
Procurement and administration (4)
Project and site Management (2)
Engineers (6)
Technicians (12)
Subcontractors (3)
Subcontractors Manpower (12)

South Fertilizer 52 MW Turnkey EPC Power Station
Project Details
Project Name:
South Fertilizer Power Station
Customer: South Fertilizer Company — Ministry of Industry, IRAQ
Scope:
Turnkey for the Engineering. Design, Procurement, and Construction (EPC) of Greenfield 50 MW Power Station
Project with Two new Nuovo Pi grione gas turbine M5001 PA and BOP at Khor Al Zubair Fertilizer plant
Equipment:
Two GE Nuovo Pignone gas turbine MS5001 PA (model MS5371)
Completion: July 2011
Manpower
Engineering and Design team (4)
Procurement and administration (12)
Project and site Management (4)
Engineers (15)
Technicians (80)
Subcontractors (6)
Subcontractors Manpower (120)

Taji 3 New Hitachi H25 Gas Turbines
Project Details
Project Name:
Taji Replacing 3 x Fr5 with 3 x H25 Gas Turbines Project
Customer:
Hitachi — UNDP/Japanese Funds
Scope:
Turnkey for the disassembly and removal of three GE Fr5 and replacing them with three Hitachi H25 Gas Turbines (Mechanical, Electrical, Controls, and Civil)
Equipment:
H25 Gas Turbine Generating units (25 MW)
Completion: Sept 2007
Manpower
Project and site Management (2)
Engineers(14)
Technicians (52)
Subcontractors (2)
Subcontractors Manpower (30)

Baiji 3 x GE TM2500 Engine and Package Refurbishments
Project Details
Project Name:
Baiji three GE TM2500 packages
Customer:
US Department of the Army, Joint contracting Command-IRAQ/Afghanistan, Project and Contracting Office (PCO)-Electrical Sector
Scope:
Turnkey of one LM2500 gas turbine engine and refurbishment of thee TM2500 packages
Equipment:
Three GE TM2500 Gas Turbine Generating units
Completion: July 2007
Manpower
Project and site Management (2)
Engineers (8)
Technicians (20)
Subcontractors (2)

Mosul Overhaul 2 x Hitachi Fr5 Gas Turbines
Project Details
Project Name:
Mosul overhaul 2 x Hitachi Fr5 Gas Turbines Project
Customer:
Hitachi — UNDP/Japanese Funds
Scope:
Major overhaul of Turbine, Auxiliaries, and Balance of Plan
Equipment:
One Fr5 Gas Turbine Generating units (20 MW)
Completion: 2008
Manpower
Project and site Management (2)
Engineers (10)
Technicians (36)
Subcontractors (2)
Subcontractors Manpower (20)
Zafaraniya Diesel Power Station Overhaul
Project Details
Project Name:
Zafaraniya 4 x Wartsila Diesel Engine and Package refurbishment
Customer:
Fluor International/Coalition Provisional Authority (CPA)
Scope: Diesel overhaul, Generator rebuild, Piping and welding, Controls and control wiring construction, machining large parts
Equipment:
4 Wartsila Diesel Generating units (4 x 9 MW)
Completion: October 2004
Manpower
Site management (1)
Engineers (15)
Technicians (38)


Mosul 2 New Hitachi H25 Gas Turbines
Project Details
Project Name:
Mosul Replacing 2 x Fr5 with 2 x H25 Gas Turbines Project
Customer:
Hitachi — UNDP/Japanese Funds
Scope:
Turnkey for the disassembly and removal of two GE Fr5 and replacing them with two Hitachi H25 Gas Turbines (Mechanical, Electrical, Controls, and Civil)
Equipment:
One Fr5 Gas Turbine Generating units (20 MW)
Completion: 2008
Manpower
Project and site Management (2)
Engineers (10)
Technicians (36)
Subcontractors (2)
Subcontractors Manpower (20)

Karkh GEC RR AVON Engine and Package Repair
Project Details
Project Name:
GEC Rolls Royce AVON engine and package repair in the Karkh Water Treatment Plant (WTP)
Customer:
Readiness Management Support/ USAID
Scope:
Replacement of one RR AVON 1533 engine, package repair, AC Generator winding, and the supply and replacement of one GEC Power Turbine
Equipment:
GEC Rolls Royce AVON 1534-70/L Gas Turbine Generating unit (2 x 12.5 MW)
Completion: April 2004
Manpower
Site Manager (1)
Engineers (4)
Technicians (10)

Qudus 250 MW Turnkey EPC Expansion Project Two New Tri-Fuel GE Fr9E
Project Details
Project Name:
250 MW Quads Expansion Project
Customer: US Department of the Army, Joint contracting Command-IRAQ/Afghanistan, Project and Contracting Office (PCO)-Electrical Sector
Scope:
Turn key for the Engineering. Design, Procurement, and Construction (EPC) of 250 MW Expansion Project.
Equipment:
250 MW Two GE Fr9 Crude Burning units
Completion: April 2009
Manpower
Engineering and Design team (12)
Procurement and administration (6)
Project and site Management (4)
Engineers (60)
Technicians (300)
Subcontractors (6)
Subcontractors Manpower (250)

Shuiba One GE Fr5 Rehabilitation & Controls Upgrade
Project Details
Project Name: Shauiba One GE Fr5 Rehabilitation Project
Customer: US Department of the Army, Joint contracting Command-IRAQ/Afghanistan, Project and Contracting Office (PC0)-Electrical Sector
Scope:
Turnkey for the rehabilitation, upgrade, and upgrade of one GE Fr5 Gas Turbine unit. Including Turbine, Auxiliaries, and Balance of Plant, and upgrade of control system from GE Mark II to Mark VI.
Equipment:
One Fr5 Gas Turbine Generating units (25 MW)
Completion: August 2007
Manpower
Project and site Management (2)
Engineers (12)
Technicians (20)
Subcontractors (3)
Subcontractors Manpower (40)