top of page
Taji Rehabilitation Installation 2 Mosul 3 X Fr5 Package Major Overhaul Shauiba Rehabilitation, including Mark IV Controls upgrade  Bayji 7 X LM2500, Auxiliaries and Package repairs, replacing new engines  Mullah Adbulla Fr5 Unit, Package disassembly from

8

Mosul 3 X Fr5 Package Major Overhaul

      Hitachi

  2006

 

9

 

 

 

Mosul Installation 2 X H25 Hitachi units

     

      Hitachi

 

  2006

10

 Taji Rehabilitation 3 X Fr5 
 

       Hitachi 
 

  2006

11

Installation 2 X H25 Units 

       Hitachi 

  2006

 

12 

 

Shauiba Rehabilitation, including

Mark IV Controls upgrade for 2 X Fr5

 

  Joint Contracting Command

   USA/COE

 

  2006

 

13

 

 Bayji 7 X LM2500, Auxiliaries and

Package repairs, replacing new

engines

 

   Joint Contracting

  Command USA/COE

 

   2006

 

14

 

 Mullah Adbulla Fr5 Unit,

Package disassembly from

Shuaiba PowerPlant . Erecting,

installation and commissioning

of Fr5 unit

 

Joint Contracting

Command USA/COE

 

    2006

 

15

 

 Turn-key Al-Quads

Expansion Project.(EPC) of 250

MW 2x Fr9E units

 

Joint Contracting

Command USA/COE

 

     2007

#

                              PROJECT

                      

 CUSTOMER                       YEAR

2006-2008

  • Facebook Metallic
  • Twitter Metallic
  • YouTube Metallic
  • LinkedIn Metallic
  • Google Metallic
bottom of page